Basic Info.
Application
Power, Electronic, Instrument, Lighting
Core
Core-type Transformer
Cooling Method
Dry-type Transformer
Winding Type
Separated Winding Transformer
Usage
Single-phase Transformer, Rectifier Transformer, Combined Transformer, Power Transformer, Distribution Transformer
Frequency Characteristics
Power Frequency
Product Description
1.Application scope
The instruction is applicable to SC10/11/12/13. SCB10/11/12/13 series in our company and rated capacity ≤6300KVA voltage ,voltage degree≤35KV, load and unload regulate voltage Epoxy resin insulation dry-type power transformer, load, transporation, stock, install, usage and repair.
2. Character & Application
The Epoxy resin pour dry-type power transformer take advanced technology from oversea,scientific artcraft, our company do test again and again,offen make rationalize test to solve this top degree problem,all technic character are meet National standard GB1094.1~2-1996,GB6450-86,techni specification meet to GB/T10228-1997 standard.
The product have following feature:
2.1 Reduce the thickness of envelopment resin ,increase the heating ability of coil.
2.2 The Coil take the grid boad which is made of Glass fiber to increase coil mechanic strength,improve to anti-shor circuit ability,coil won't crack forever.
2.3Coil take vacuum injection handcraft ,proper reduce the discharge and improve the electric strength.
2.4 Higher ability of anti-explosion, stability of cool and hot strike,low noise.
2.5 With temperature control and Cooling device,3 phase temperature scres show,start fan motor, auotomatic,over-temperature warning,over-temperature shut down,and black dense function, while connecting RS485 communication to computer,operation center inspection and control.
Our Epoxy resin pour dry-type power transformer have above feature,so this kinds of product wifely used for ouput transformer systetm.such as Hotel, Airport,Higher architecture,business center,department bulding and others important place, also subway,smelt,power factory,steamship,sea artesian well and others bad environment place.
3.Usage requirement
3.1 indoor
3.2 1000M, the altitude less than 1000M,
3.3 Environment temperature
The Max temperature:+40ºC
The max day average temperature:+30ºC
The max year average temperature:+20ºC:
The low temperature:-5ºC
3.4the wave of power voltage:
The wave of power voltage similar with Sine wave
3.5 The Symmetry of multiphase
The connecting power voltage of multiphase similar symmetry.
3.6 Insulated temperature resistance F degree.
3.7 With Cover protection degree IP20,IP23 and so on.
4. Product Transportation
4.1 can be transported by Train, steamship,truck,air and others transportation,the truck trunk or ship store must be clean and no dirty.
4.2 When load must be fix tighten,to prevent the bump,hit,librate and impact,also the sunshine and rain.
4.3 Transformer without package ,accessory,and documents and others to make package together to delivery.
4.4 when transportation, the lean must be less than 15°.
4.5 Don't discharge in mass when station , dock transfer or destination,must make wood fill up, which more than 100MM.
5. Product load & discharge.
5.1 Product load and discharge can take by crane,travelling crane and others device,and strict meet national requirement process.
5.2When transportation, if with package carton, should mark on each angle.
6. Inspection before receive
when customer get the transformer, should inspecti it.
6.1 Package and moistureproof well,no water invade trail.
6.2 Check the product label such as the model rated capacity, rated voltage,connection no.anti-voltage,outside size,construction,weight and other whether meet contract requirement or national standard.
6.3 Check the instructon, test confirm,test report,packing list and others documents
6.4 Check the accessory, back up product specification, quantity, whether same as packing list.
6.5 Check whether have damage when transportation,the accessory damnify ,start,rupture,insulated whether have broken and so on.
6.6 After inspection all, if not put into operation, sould package well and store.
7. Product install
7.1 Should read this instruction, product label, outside size before installing, know the weight, how to install and others,ready to others device and tools.
7.2 the basic instruction must be meet load, shockproof,ventilation requirement..
7.3 Indoor ventilation and fire protection meet relative requirement,ventiduct airproof well,vent hole don't connect with others air system.
7.4 Temperature control,temperature show device should put obviousity place, easy to check.
7.5 inddor liging disposal meet relative regulate.
7.6 inddor take fire-resist material, door to ourside and label decive name, safe warning,protective net door and others safety establishment.
7.7 When connect transformer to electric device, the electric device should meet design requirement and relative point.
7.8 Conductor fix well and phase colour should clearly.
7.9 the distance between the electric phase and against earth meet relative design requirement,connecting earth should fix well.
7.10 The power of temperature device should from the femal rank side transformer,have enough capacity to fuse operation, and tale change to double power automatic according to the emergengy degree.
8.Inspection before operation
8.1 Measure all tap change,meet nameplate change rule,and rated tap allow error is ±0.5%,the rest allow error is less than1%.
8.2 Test the 3 phase transformer connecting or the pole of single transformer ,meet nameplate requirement.
8.3 Measure the insulated resist of coil, the value more than 70% test value.
8.4 Measure the iron coil insulated resist, the value more than 5MΩ.
8.5 Outside press anti-voltae test, the test voltage should be 85% of test voltage.
8.6 About the load regulate voltage transformer, should according to the load regulate tap switch instruction to put into test check and test.
9.Test operation
9.1 Before operation, should according to the nameplate and tap direction label to make tap slice into correct position.
9.2 when unload regulate voltage, should according to electric net voltage to make regulate voltage tap slice,nameplate and tap direction to make correction position.
9.3 Load regulate voltage, should according to load voltage tap switch instruction, tao swutcg test wekk after shut power ,then can put into operation.
9.4 the transformer have temperature control box and temperature show,please check attached instrciton,when temperature is normal, put the transformer operation at first, then put into temperature control and shower.
9.5 After transformer operaion,the load shoud from light to heavy, don't make one big load blindness.
9.6 Over load should meet GB/T17211 (dry type transformer load rule)
9.7 After transformer stope operation, no need take others action to put into operation again, but if higher humid and transformer have cold already, so should take dry action, then transformer can operation again.
10.Repair and Maintain
To maintain the transformer operation well, should make repaire and maintaince.
10.1 Generally, in dry place, clearn it one time every year or mor long time. If others place if have dust or chemisty air inside, should check every 3 month or 6 month.
10.2 When check, if find collect dust, should clearn them to keep the air ventilation and prevent insulated attack.special clearn the insulated terminal of transformer,the mat of desk,and keep the dry compress air(2-5 dry air) to clean the dust
10.3 Check the fix firmware,join piece whether start, conductor whether have rust,corrosive trial,also check whether have climp electric and carbon trial on the insulated surface.Should take relative action to solve if need.
10.4 Load regulate voltage transformer should consider the resistant of load tap switch to judge the transformer whether can operation, no need make the rest test.
10.5 After several year operation( Suggest 5 years),to do the resulated resist test to judge the transformer whether can operation, no need make the rest test.
10.6 After Dry-type transformer inspection, should meet the (Electric transformer repaire rule) DL/T573 and the electric device anti-test rule.
11.Repair and Maintain
11.1 When transformer operantion, should make safe barrier around transformer, to prevent accident.
11.2 When transformer operantion,Warning to touch the main part of transformer to prevent accident.
11.2 The test of transformer,install, repaire should be done by qualification worker.
Address:
C District, Chongren Industrial Park, Jiangxi
Business Type:
Manufacturer/Factory
Business Range:
Electrical & Electronics
Company Introduction:
Our company offers variety of products which can meet your multifarious demands. We adhere to the management principles of quot&quality first, customer first and credit-based" Since the establishment of the company and always do our best to satisfy potential needs of our customers.
Our company is sincerely willing to cooperate with enterprises from all over the world in order to realize a win-win situation since the trend of economic globalization has developed with an irresistible force.